🛒0

2025 Pokemon Simplified Chinese Collect 151 AR #172/151 Pikachu (Surprise) PSA 10

$2,851.26

Pre-order (sourcing) item: we dispatch within 15 business days of your order, and usually within 5 to 10 business days. You may cancel for a full refund at any time before dispatch. If we cannot source your card, we refund you in full automatically — you do not need to request it. We send updates on business day 1, business day 5 and business day 10. Chinese — language-exclusive artwork. PSA 10 (Gem Mint), graded by PSA. Image is for illustration: the graded card you receive is a PSA 10 example of this card.

Quick answer

2025 Pokemon Simplified Chinese Collect 151 AR #172/151 Pikachu (Surprise) is a PSA 10 (Gem Mint) Pokémon card graded by PSA. This is a sourcing pre-order: CardSpicy dispatches within 15 business days of your order, and refunds you in full automatically if the item cannot be sourced. CardSpicy is a Hong Kong, China based seller.

Product Photos

Pikachu (Surprise) — 151C 172/151 AR, Illustration Rare. Artist Oswaldo KATO. Collect 151, Simplified Chinese exclusive.Pikachu (Journey) →Pikachu (Hope) →Pikachu (Gathering) →
Pikachu (Surprise) — artwork breakdown for 151C 172/151 AR (Collect 151). Artist Oswaldo KATO.

About the artist

Born in São Paulo, working in Japan. Debuted in Chilling Reign with Venipede, and has since become one of the most prolific illustrators of the modern era — over eighty cards.

KATO's signatures are lighting and linework that read as texture, plus a long run of Stadium cards. Collect 151 handed him all four of its exclusive Pikachu.

Drew every one of the four exclusive Pikachu Art Rares in Collect 151.

Artist credit as printed on the card face (Illus.).

What you are ordering

Pikachu (Surprise) from Collect 151 (151C 172/151) — a Chinese exclusive release. This artwork was commissioned and released only in the Chinese print run.

Condition & grading

You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards: a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a clean surface.

Important: because this is a sourcing pre-order, we do not hold a specific slab when you order. The certification number is issued to us only once we have sourced your card, and it will be confirmed to you before dispatch. We never publish a certification number we do not yet hold.

Read our Grading Guide for how PSA grades work, and why we only sell PSA 10.

Why the artwork matters

The Collect 151 set introduced four separate Chinese exclusive Pikachu illustrations — one per sub-release. None of the four exist in any other language.

Dispatch & cancellation

  • We dispatch within 15 business days of your order — in practice most orders ship in 5–10 business days. The 15-business-day window is our maximum commitment, not our usual timeline.
  • You may cancel for a full refund at any time before dispatch.
  • If we cannot source the card, we refund you in full automatically — no request needed.
  • We send progress updates on business day 1, business day 5 and business day 10.
  • If we have not dispatched by business day 15, we will contact you before that date to either refund you in full or ask for your explicit consent to wait longer.
  • Full terms: Pre-Order & Sourcing Terms. Please also read our Refund Policy and Shipping Policy.

Shipping

Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case with bubble wrap and rigid board backing.

Frequently asked questions

Which Pikachu is this?
Pikachu (Surprise), card 151C 172/151 from Collect 151. Collect 151 carries four Pikachu AR cards in the Chinese set — 170/151 (Journey), 171/151 (Hope), 172/151 (Surprise) and 173/151 (Gathering). They are four separate artworks, not four printings of one card.
Is this artwork in the Japanese or English set too?
No. This is a Chinese exclusive release — the artwork was commissioned and released only in the Chinese print run.
Do I get the PSA certification number before I pay?
No. This is a sourcing pre-order, so we do not hold a specific slab when you order. The certification number is issued to us only once the card is sourced, and it is confirmed to you before dispatch. We never publish a certification number we do not yet hold.
Can I cancel, and what if the card cannot be sourced?
Yes — you can cancel for a full refund at any time before dispatch. If we cannot source the card, you are refunded in full automatically, with no request needed. We send progress updates on business day 1, 5 and 10, and if we have not dispatched by business day 15 we contact you before that date.

Looking for a different card?

Can’t find the card you want? Find this Card for Me — tell us the card, set and card number, and we will come back with a price and a lead time before you pay anything.

Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact slab pictured.

Additional information

Option

Pre-Order

All sales are final. Every item we sell — graded cards and accessories alike — is non-returnable and non-refundable once dispatched.

Three exceptions apply: orders we cannot fulfil, items that arrive damaged or incorrect, and sourced items cancelled before dispatch. Full detail: Policies.

Pre-order items

How pre-order items are dispatched

  • Priced $50 or more — ships separately and first, on its own, as soon as it arrives.
  • Priced under $50 — combined with your in-stock items into a single parcel.
  • Splitting a shipment never adds an extra shipping charge.
  • Dispatch window is unchanged: within 15 business days of order confirmation.
  • Need your in-stock items sooner? Place a separate order for the in-stock items.

In-stock items

How in-stock items are dispatched

  • Dispatched within 2 business days.
  • If your order also contains pre-order items priced under $50, they travel in the same parcel — it leaves once they arrive.
  • Pre-order items priced $50 or more ship separately, so they never hold up the rest of your order.
  • Free US shipping on orders of $50 or more.