🛒0

2023 Pokemon Simplified Chinese CSM2CC Moltres & Zapdos & Articuno GX #185 PSA 10

$193.65

Pre-order (sourcing) item: we dispatch within 15 business days of your order, and usually within 5 to 10 business days. You may cancel for a full refund at any time before dispatch. If we cannot source your card, we refund you in full automatically — you do not need to request it. We send updates on business day 1, business day 5 and business day 10. Simplified Chinese print run. PSA 10 (Gem Mint), graded by PSA. Image is for illustration: the graded card you receive is a PSA 10 example of this card.

Category:
Tags: ,

Quick answer

2023 Pokemon Simplified Chinese CSM2CC Moltres & Zapdos & Articuno GX #185 is a PSA 10 (Gem Mint) Pokémon card graded by PSA. This is a sourcing pre-order: CardSpicy dispatches within 15 business days of your order, and refunds you in full automatically if the item cannot be sourced. CardSpicy is a Hong Kong, China based seller.

Product Photos

Moltres & Zapdos & Articuno GX — CSM2CC #185, PSA 10. Artist 5ban Graphics. CSM2CC, Simplified Chinese exclusive.Gardevoir & Sylveon GX →Umbreon & Darkrai GX →Togepi & Cleffa & Igglybuff GX →
Moltres & Zapdos & Articuno GX — artwork breakdown for CSM2CC #185 (CSM2CC).

About the artist

The in-house CG studio at Creatures Inc. Responsible for most of the full-art and mechanical-looking cards since Black & White, including a large share of the modern ex and V cards.

Artist credit as printed on the card face (Illus.).

What you are ordering

Moltres & Zapdos & Articuno GX from CSM2CC — the Simplified Chinese print run of this card.

Condition & grading

You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards: a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a clean surface.

Important: because this is a sourcing pre-order, we do not hold a specific slab when you order. The certification number is issued to us only once we have sourced your card, and it will be confirmed to you before dispatch. We never publish a certification number we do not yet hold.

Read our Grading Guide for how PSA grades work, and why we only sell PSA 10.

About this release

This is the Simplified Chinese printing of the card. Chinese print runs are produced in far smaller quantities than the Japanese and English runs, and are distributed mainly inside mainland China — which is why graded Simplified Chinese copies are scarcer than their Japanese or English equivalents.

Dispatch & cancellation

  • We dispatch within 15 business days of your order — in practice most orders ship in 5–10 business days. The 15-business-day window is our maximum commitment, not our usual timeline.
  • You may cancel for a full refund at any time before dispatch.
  • If we cannot source the card, we refund you in full automatically — no request needed.
  • We send progress updates on business day 1, business day 5 and business day 10.
  • If we have not dispatched by business day 15, we will contact you before that date to either refund you in full or ask for your explicit consent to wait longer.
  • Full terms: Pre-Order & Sourcing Terms. Please also read our Refund Policy and Shipping Policy.

Shipping

Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case with bubble wrap and rigid board backing.

Frequently asked questions

Is this the Simplified Chinese version?
Yes — this is the Simplified Chinese print of CSM2CC Moltres & Zapdos & Articuno GX #185. Simplified Chinese print runs are far smaller than the Japanese and English runs, which makes graded copies scarcer.
Is the photo the exact card I will receive?
No. The image is for illustration; you receive a PSA 10 example of this card, and the certification number is confirmed to you before dispatch.
Can I cancel before it ships?
Yes — you can cancel for a full refund at any time before dispatch, and if we cannot source the card we refund you in full automatically.

Looking for a different card?

Can’t find the card you want? Find this Card for Me — tell us the card, set and card number, and we will come back with a price and a lead time before you pay anything.

Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact slab pictured.

Additional information

option

Pre-Order

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

All sales are final. Every item we sell — graded cards and accessories alike — is non-returnable and non-refundable once dispatched.

Three exceptions apply: orders we cannot fulfil, items that arrive damaged or incorrect, and pre-orders cancelled before dispatch. Full detail: Policies.

Pre-order items

How pre-order items are dispatched

  • Priced $50 or more — ships separately and first, on its own, as soon as it arrives.
  • Priced under $50 — combined with your in-stock items into a single parcel.
  • Splitting a shipment never adds an extra shipping charge.
  • Dispatch window is unchanged: within 15 business days of order confirmation.
  • Need your in-stock items sooner? Place a separate order for the in-stock items.

In-stock items

How in-stock items are dispatched

  • Dispatched within 2 business days.
  • If your order also contains pre-order items priced under $50, they travel in the same parcel — it leaves once they arrive.
  • Pre-order items priced $50 or more ship separately, so they never hold up the rest of your order.
  • Free US shipping on orders of $50 or more.