Quick answer
2026 Pokemon Simplified Chinese Blade Awakening Morty’s Confidence #250 is a PSA 10 (Gem Mint) Pokémon card graded by PSA. This is a sourcing pre-order: CardSpicy dispatches within 15 business days of your order, and refunds you in full automatically if the item cannot be sourced. CardSpicy is a Hong Kong, China based seller.
Product Photos
Greninja Ex →Raging Bolt Ex →Lana's Aid →More from CSV7C on cardspicy.com: 2026 Pokemon Simplified Chinese Blade Awakening Bianca’s Devotion #249 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Dachsbun Ex #106 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Dachsbun Ex #240 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Gouging Fire Ex #238 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Greninja Ex #242 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Iron Crown Ex #241 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Iron Leaves Ex #237 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Lana’s Aid #246 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Morty’s Conviction #250 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Raging Bolt Ex #244 PSA 10 · 2026 Pokemon Simplified Chinese Blade Awakening Walking Wake Ex #239 PSA 10

About the artist
Megumi Mizutani is an illustrator for the Pokémon Trading Card Game and one of the Pokémon designers since Generation V, thus leading to other credits, such as conceptual character artist for Pokémon the Series: Black & White.
Artist credit as printed on the card face (Illus.).
See every card by Megumi Mizutani →
What you are ordering
Morty’s Confidence from CSV7C — the Simplified Chinese print run of this card.
Condition & grading
You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards: a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a clean surface.
Important: because this is a sourcing pre-order, we do not hold a specific slab when you order. The certification number is issued to us only once we have sourced your card, and it will be confirmed to you before dispatch. We never publish a certification number we do not yet hold.
Read our Grading Guide for how PSA grades work, and why we only sell PSA 10.
About this release
This is the Simplified Chinese printing of the card. Chinese print runs are produced in far smaller quantities than the Japanese and English runs, and are distributed mainly inside mainland China — which is why graded Simplified Chinese copies are scarcer than their Japanese or English equivalents.
Dispatch & cancellation
- We dispatch within 15 business days of your order — in practice most orders ship in 5–10 business days. The 15-business-day window is our maximum commitment, not our usual timeline.
- You may cancel for a full refund at any time before dispatch.
- If we cannot source the card, we refund you in full automatically — no request needed.
- We send progress updates on business day 1, business day 5 and business day 10.
- If we have not dispatched by business day 15, we will contact you before that date to either refund you in full or ask for your explicit consent to wait longer.
- Full terms: Pre-Order & Sourcing Terms. Please also read our Refund Policy and Shipping Policy.
Shipping
Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case with bubble wrap and rigid board backing.
Frequently asked questions
- Is this the Simplified Chinese version?
- Yes — this is the Simplified Chinese print of Blade Awakening Morty’s Confidence #250. Simplified Chinese print runs are far smaller than the Japanese and English runs, which makes graded copies scarcer.
- Is the photo the exact card I will receive?
- No. The image is for illustration; you receive a PSA 10 example of this card, and the certification number is confirmed to you before dispatch.
- Can I cancel before it ships?
- Yes — you can cancel for a full refund at any time before dispatch, and if we cannot source the card we refund you in full automatically.
Looking for a different card?
Can’t find the card you want? Find this Card for Me — tell us the card, set and card number, and we will come back with a price and a lead time before you pay anything.
Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact slab pictured.







Reviews
There are no reviews yet.