Product Photos
Radiant Venusaur →More from Gallant Galaxy on cardspicy.com: 2024 Pokemon Simplified Chinese Gallant Galaxy #004/128 Radiant Venusaur PSA 10

What you are ordering
Radiant Eevee from Gallant Galaxy (cs5aC 092/127) — the Chinese print run of this set.
Condition & grading
You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards:
a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a
clean surface.
Important: because this is a sourcing pre-order, we do not hold a specific slab when you
order. The certification number is issued to us only once we have sourced your card, and it will be confirmed
to you before dispatch. We never publish a certification number we do not yet hold.
Read our Grading Guide for how PSA grades work, and
why we only sell PSA 10.
About this release
This artwork comes from the Chinese print run of the set. Chinese runs are printed and
distributed only in mainland China, in far smaller quantities than the Japanese or English printings, so graded
copies are correspondingly scarce.
Dispatch & cancellation
- We dispatch within 30 days of your order — in practice most orders ship in 7–14 days.
The 30-day window is our maximum commitment, not our usual timeline. - You may cancel for a full refund at any time before dispatch.
- If we cannot source the card, we refund you in full automatically — no request needed.
- We send progress updates on day 1, day 7 and day 14.
- If we have not dispatched by day 30, we will contact you before that date to either refund
you in full or ask for your explicit consent to wait longer. - Full terms: Pre-Order & Sourcing Terms. Please also read our
Refund Policy and Shipping Policy.
Shipping
Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case
with bubble wrap and rigid board backing.
Looking for a different card?
Can’t find the card you want? Send us a sourcing request — tell us the card, set and
card number, and we will come back with a price and a lead time before you pay anything.
Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact
slab pictured.







