Quick answer
2025 Pokemon Simplified Chinese Gem Pack Vol.3 Arven [Full Art] #1904 is a PSA 10 (Gem Mint) Pokémon card graded by PSA. This is a sourcing pre-order: CardSpicy dispatches within 15 business days of your order, and refunds you in full automatically if the item cannot be sourced. CardSpicy is a Hong Kong, China based seller.
Product Photos
Absol [Stamped] →Mimikyu [Full Art] →Metal Energy [Stamped] →More from CBB3C on cardspicy.com: 2025 Pokemon Simplified Chinese Gem Pack Vol.3 Absol [Stamped] #806 PSA 10 · 2025 Pokemon Simplified Chinese Gem Pack Vol.3 Fighting Energy [Stamped] #2004 PSA 10 · 2025 Pokemon Simplified Chinese Gem Pack Vol.3 Metal Energy [Stamped] #2005 PSA 10 · 2025 Pokemon Simplified Chinese Gem Pack Vol.3 Mimikyu [Full Art] #1307 PSA 10
![Arven [Full Art] — artwork breakdown for GP3 #1904 (Gem Pack Vol.3).](https://cardspicy.com/wp-content/uploads/2026/10/5504-2-artwork.jpg?v=1791776106)
About the artist
Debuted in the 151 expansion with Horsea and Seadra. Twenty cards credited so far, and a steady run of the Scarlet & Violet era since.
Artist credit as printed on the card face (Illus.).
What you are ordering
Arven [Full Art] from CBB3C — the Simplified Chinese print run of this card.
Condition & grading
You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards: a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a clean surface.
Important: because this is a sourcing pre-order, we do not hold a specific slab when you order. The certification number is issued to us only once we have sourced your card, and it will be confirmed to you before dispatch. We never publish a certification number we do not yet hold.
Read our Grading Guide for how PSA grades work, and why we only sell PSA 10.
About this release
This is the Simplified Chinese printing of the card. Chinese print runs are produced in far smaller quantities than the Japanese and English runs, and are distributed mainly inside mainland China — which is why graded Simplified Chinese copies are scarcer than their Japanese or English equivalents.
Dispatch & cancellation
- We dispatch within 15 business days of your order — in practice most orders ship in 5–10 business days. The 15-business-day window is our maximum commitment, not our usual timeline.
- You may cancel for a full refund at any time before dispatch.
- If we cannot source the card, we refund you in full automatically — no request needed.
- We send progress updates on business day 1, business day 5 and business day 10.
- If we have not dispatched by business day 15, we will contact you before that date to either refund you in full or ask for your explicit consent to wait longer.
- Full terms: Pre-Order & Sourcing Terms. Please also read our Refund Policy and Shipping Policy.
Shipping
Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case with bubble wrap and rigid board backing.
Frequently asked questions
- Is this the Simplified Chinese version?
- Yes — this is the Simplified Chinese print of Gem Pack Vol.3 Arven [Full Art] #1904. Simplified Chinese print runs are far smaller than the Japanese and English runs, which makes graded copies scarcer.
- Is the photo the exact card I will receive?
- No. The image is for illustration; you receive a PSA 10 example of this card, and the certification number is confirmed to you before dispatch.
- Can I cancel before it ships?
- Yes — you can cancel for a full refund at any time before dispatch, and if we cannot source the card we refund you in full automatically.
Looking for a different card?
Can’t find the card you want? Find this Card for Me — tell us the card, set and card number, and we will come back with a price and a lead time before you pay anything.
Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact slab pictured.







Reviews
There are no reviews yet.