Product Photos
Floragato & Liko →Crocalor & Roy →Quaxwell & Dot →More from Gem Pack Vol.5 on cardspicy.com: 2026 Pokemon Simplified Chinese Gem Pack Vol.5 AR Crocalor & Roy PSA 10 · 2026 Pokemon Simplified Chinese Gem Pack Vol.5 AR Floragato & Liko PSA 10 · 2026 Pokemon Simplified Chinese Gem Pack Vol.5 AR Quaxwell & Dot PSA 10

What you are ordering
Captain Pikachu & Friede from Gem Pack Vol.5 (CBB5C) — a Chinese exclusive release. This artwork was commissioned and released only in the Chinese print run.
Condition & grading
You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards: a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a clean surface.
Important: because this is a sourcing pre-order, we do not hold a specific slab when you order. The certification number is issued to us only once we have sourced your card, and it will be confirmed to you before dispatch. We never publish a certification number we do not yet hold.
Read our Grading Guide for how PSA grades work, and why we only sell PSA 10.
Why the artwork matters
Every Gem Pack volume has included original artwork commissioned for the Chinese release only, in limited print runs with no confirmed reprints.
Dispatch & cancellation
- We dispatch within 30 days of your order — in practice most orders ship in 7–14 days. The 30-day window is our maximum commitment, not our usual timeline.
- You may cancel for a full refund at any time before dispatch.
- If we cannot source the card, we refund you in full automatically — no request needed.
- We send progress updates on day 1, day 7 and day 14.
- If we have not dispatched by day 30, we will contact you before that date to either refund you in full or ask for your explicit consent to wait longer.
- Full terms: Pre-Order & Sourcing Terms. Please also read our Refund Policy and Shipping Policy.
Shipping
Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case with bubble wrap and rigid board backing.
Looking for a different card?
Can’t find the card you want? Send us a sourcing request — tell us the card, set and card number, and we will come back with a price and a lead time before you pay anything.
Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact slab pictured.








