Quick answer
2026 Pokemon Simplified Chinese Grand Terastal Gathering SAR #234/208 Sylveon ex is a PSA 10 (Gem Mint) Pokémon card graded by PSA. This is a sourcing pre-order: CardSpicy dispatches within 15 business days of your order, and refunds you in full automatically if the item cannot be sourced. CardSpicy is a Hong Kong, China based seller.
Product Photos


About the artist
Debuted in 2023 with a moonlit Umbreon in Obsidian Flames, then an illustration rare Dragonair in 151. Twenty cards, plus eight in TCG Pocket.
rika's work reads like traditional watercolour — Pokémon.com described the depth as making you feel you are inside the illustration. Softness is the signature.
Sylveon ex — Chinese-exclusive Tera SAR, Grand Terastal Gathering.
Artist credit as printed on the card face (Illus.) · the Pokémon official site.
What you are ordering
Sylveon ex from Grand Terastal Gathering (csv9.5C 234/208) — the Chinese print run of this set.
Condition & grading
You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards:
a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a
clean surface.
Important: because this is a sourcing pre-order, we do not hold a specific slab when you
order. The certification number is issued to us only once we have sourced your card, and it will be confirmed
to you before dispatch. We never publish a certification number we do not yet hold.
Read our Grading Guide for how PSA grades work, and
why we only sell PSA 10.
About this release
This artwork comes from the Chinese print run of the set. Chinese runs are printed and
distributed only in mainland China, in far smaller quantities than the Japanese or English printings, so graded
copies are correspondingly scarce.
Dispatch & cancellation
- We dispatch within 15 business days of your order — in practice most orders ship in 5–10 business days.
The 15-business-day window is our maximum commitment, not our usual timeline. - You may cancel for a full refund at any time before dispatch.
- If we cannot source the card, we refund you in full automatically — no request needed.
- We send progress updates on business day 1, business day 5 and business day 10.
- If we have not dispatched by business day 15, we will contact you before that date to either refund
you in full or ask for your explicit consent to wait longer. - Full terms: Pre-Order & Sourcing Terms. Please also read our
Refund Policy and Shipping Policy.
Shipping
Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case
with bubble wrap and rigid board backing.
Frequently asked questions
- Is this the Simplified Chinese version?
- Yes — this is the Simplified Chinese print of Grand Terastal Gathering SAR #234/208 Sylveon ex. Simplified Chinese print runs are far smaller than the Japanese and English runs, which makes graded copies scarcer.
- Is the photo the exact card I will receive?
- No. The image is for illustration; you receive a PSA 10 example of this card, and the certification number is confirmed to you before dispatch.
- Can I cancel before it ships?
- Yes — you can cancel for a full refund at any time before dispatch, and if we cannot source the card we refund you in full automatically.
Looking for a different card?
Can’t find the card you want? Find this Card for Me — tell us the card, set and
card number, and we will come back with a price and a lead time before you pay anything.
Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact
slab pictured.







