🛒0

2026 Pokemon Simplified Chinese Gem Pack Vol.6 AR #1907/07 Applin PSA 10

$533.38

Pre-order (sourcing) item: we dispatch within 15 business days of your order, and usually within 5 to 10 business days. You may cancel for a full refund at any time before dispatch. If we cannot source your card, we refund you in full automatically — you do not need to request it. We send updates on business day 1, business day 5 and business day 10. Chinese. PSA 10 (Gem Mint), graded by PSA. Image is for illustration: the graded card you receive is a PSA 10 example of this card.

Quick answer

2026 Pokemon Simplified Chinese Gem Pack Vol.6 AR #1907/07 Applin is a PSA 10 (Gem Mint) Pokémon card graded by PSA. This is a sourcing pre-order: CardSpicy dispatches within 15 business days of your order, and refunds you in full automatically if the item cannot be sourced. CardSpicy is a Hong Kong, China based seller.

Product Photos

Applin — CBB6C 19 07/07, Illustration Rare. Artist Jiro Sasumo. Gem Pack Vol.6, Simplified Chinese exclusive.
Applin — artwork breakdown for CBB6C 19 07/07 (Gem Pack Vol.6). Artist Jiro Sasumo.

About the artist

An office worker and part-time illustrator who won the 2nd Pokémon Card Game Illustration Grand Prix — the winning piece, a Charizard, was printed as an S-P promo. He studied fine art, but only turned professional after the win.

His stated aim is to draw a scene so that the viewer feels its atmosphere and story as if they were standing in it; he works in Photoshop on a pen tablet. Leafeon ex from Prismatic Evolutions is the best known of his cards.

Applin — Chinese-exclusive AR, Gem Pack Vol.6.

Artist credit as printed on the card face (Illus.) · the official Pokémon Card Game Illustration Contest 2024 results.

What you are ordering

Applin from Gem Pack Vol.6 (CBB6C 1907/07) — a Chinese exclusive release.

Condition & grading

You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards:
a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a
clean surface.

Important: because this is a sourcing pre-order, we do not hold a specific slab when you
order. The certification number is issued to us only once we have sourced your card, and it will be confirmed
to you before dispatch. We never publish a certification number we do not yet hold.

Read our Grading Guide for how PSA grades work, and
why we only sell PSA 10.

Why the artwork matters

This artwork was commissioned and released only in the Chinese print run,
which makes its graded population among the smallest in the Chinese range.

Dispatch & cancellation

  • We dispatch within 15 business days of your order — in practice most orders ship in 5–10 business days.
    The 15-business-day window is our maximum commitment, not our usual timeline.
  • You may cancel for a full refund at any time before dispatch.
  • If we cannot source the card, we refund you in full automatically — no request needed.
  • We send progress updates on business day 1, business day 5 and business day 10.
  • If we have not dispatched by business day 15, we will contact you before that date to either refund
    you in full or ask for your explicit consent to wait longer.
  • Full terms: Pre-Order & Sourcing Terms. Please also read our
    Refund Policy and Shipping Policy.

Shipping

Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case
with bubble wrap and rigid board backing.

Frequently asked questions

Which card is this, exactly?
Applin, card CBB6C 1907/07, from Gem Pack Vol.6, in the Simplified Chinese print run.
Is this artwork in the Japanese or English set too?
No. This is a Chinese exclusive release — the artwork was commissioned and released only in the Chinese print run.
Do I get the PSA certification number before I pay?
No. This is a sourcing pre-order, so we do not hold a specific slab when you order. The certification number is issued to us only once the card is sourced, and it is confirmed to you before dispatch. We never publish a certification number we do not yet hold.
Can I cancel, and what if the card cannot be sourced?
Yes — you can cancel for a full refund at any time before dispatch. If we cannot source the card, you are refunded in full automatically, with no request needed. We send progress updates on business day 1, 5 and 10, and if we have not dispatched by business day 15 we contact you before that date.

Looking for a different card?

Can’t find the card you want? Find this Card for Me — tell us the card, set and
card number, and we will come back with a price and a lead time before you pay anything.

Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact
slab pictured.

Additional information

option

Pre-Order

All sales are final. Every item we sell — graded cards and accessories alike — is non-returnable and non-refundable once dispatched.

Three exceptions apply: orders we cannot fulfil, items that arrive damaged or incorrect, and sourced items cancelled before dispatch. Full detail: Policies.

Pre-order items

How pre-order items are dispatched

  • Priced $50 or more — ships separately and first, on its own, as soon as it arrives.
  • Priced under $50 — combined with your in-stock items into a single parcel.
  • Splitting a shipment never adds an extra shipping charge.
  • Dispatch window is unchanged: within 15 business days of order confirmation.
  • Need your in-stock items sooner? Place a separate order for the in-stock items.

In-stock items

How in-stock items are dispatched

  • Dispatched within 2 business days.
  • If your order also contains pre-order items priced under $50, they travel in the same parcel — it leaves once they arrive.
  • Pre-order items priced $50 or more ship separately, so they never hold up the rest of your order.
  • Free US shipping on orders of $50 or more.