🛒0
CardSpicy

2025 Pokemon Simplified Chinese Gem Pack Vol.1 AR Quaxly & Dot PSA 10

$95.95

Pre-order (sourcing) item: we dispatch within 30 days of your order, and usually within 7 to 14 days. You may cancel for a full refund at any time before dispatch. If we cannot source your card, we refund you in full automatically — you do not need to request it. We send updates on day 1, day 7 and day 14. Chinese — language-exclusive artwork. PSA 10 (Gem Mint), graded by PSA. Image is for illustration: the graded card you receive is a PSA 10 example of this card.

Category:
Tags:

Product Photos

Quaxly & Dot — CBB1C 05 09/09, Illustration Rare. Artist Yamazaki Rei. Gem Pack Vol.1, Simplified Chinese exclusive.Captain Pikachu & Friede →Sprigatito & Liko →Fuecoco & Roy →
Quaxly & Dot — artwork breakdown for CBB1C 05 09/09 (Gem Pack Vol.1). Artist Yamazaki Rei.

What you are ordering

Quaxly & Dot from Gem Pack Vol.1 (CBB1C) — a Chinese exclusive release. This artwork was commissioned and released only in the Chinese print run.

Condition & grading

You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards: a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a clean surface.

Important: because this is a sourcing pre-order, we do not hold a specific slab when you order. The certification number is issued to us only once we have sourced your card, and it will be confirmed to you before dispatch. We never publish a certification number we do not yet hold.

Read our Grading Guide for how PSA grades work, and why we only sell PSA 10.

Why the artwork matters

Every Gem Pack volume has included original artwork commissioned for the Chinese release only, in limited print runs with no confirmed reprints.

Dispatch & cancellation

  • We dispatch within 30 days of your order — in practice most orders ship in 7–14 days. The 30-day window is our maximum commitment, not our usual timeline.
  • You may cancel for a full refund at any time before dispatch.
  • If we cannot source the card, we refund you in full automatically — no request needed.
  • We send progress updates on day 1, day 7 and day 14.
  • If we have not dispatched by day 30, we will contact you before that date to either refund you in full or ask for your explicit consent to wait longer.
  • Full terms: Pre-Order & Sourcing Terms. Please also read our Refund Policy and Shipping Policy.

Shipping

Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case with bubble wrap and rigid board backing.

Looking for a different card?

Can’t find the card you want? Send us a sourcing request — tell us the card, set and card number, and we will come back with a price and a lead time before you pay anything.

Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact slab pictured.

Additional information

Option

Pre-Order

All sales are final. Every item we sell — graded cards and accessories alike — is non-returnable and non-refundable once dispatched.

Three exceptions apply: orders we cannot fulfil, items that arrive damaged or incorrect, and pre-orders cancelled before dispatch. Full detail: Policies.

Pre-order items

How pre-order items are dispatched

  • Priced $50 or more — ships separately and first, on its own, as soon as it arrives.
  • Priced under $50 — combined with your in-stock items into a single parcel.
  • Splitting a shipment never adds an extra shipping charge.
  • Dispatch window is unchanged: within 30 days of order confirmation.
  • Need your in-stock items sooner? Place a separate order for the in-stock items.

In-stock items

How in-stock items are dispatched

  • Dispatched within 2 business days.
  • If your order also contains pre-order items priced under $50, they travel in the same parcel — it leaves once they arrive.
  • Pre-order items priced $50 or more ship separately, so they never hold up the rest of your order.
  • Free US shipping on orders of $50 or more.