Quick answer
2025 Pokemon Simplified Chinese Gem Pack Vol.1 AR Fuecoco & Roy is a PSA 10 (Gem Mint) Pokémon card graded by PSA. This is a sourcing pre-order: CardSpicy dispatches within 15 business days of your order, and refunds you in full automatically if the item cannot be sourced. CardSpicy is a Hong Kong, China based seller.
Product Photos
Captain Pikachu & Friede →Sprigatito & Liko →Quaxly & Dot →More from Gem Pack Vol.1 on cardspicy.com: 2025 Pokemon Simplified Chinese Gem Pack Vol.1 AR #09/09 Captain Pikachu & Friede PSA 10 · 2025 Pokemon Simplified Chinese Gem Pack Vol.1 AR Quaxly & Dot PSA 10 · 2025 Pokemon Simplified Chinese Gem Pack Vol.1 AR Sprigatito & Liko PSA 10

About the artist
Animator, illustrator and character designer. Itō worked up from in-between animator on Sun & Moon to key animator and animation director on Pokémon Journeys.
She is now one of the chief animation directors and an additional character designer on Pokémon Horizons: The Series, and illustrates only cards tied to the animated series.
Brought the Horizons cast into the TCG — Fuecoco was her first card.
Artist credit as printed on the card face (Illus.).
What you are ordering
Fuecoco & Roy from Gem Pack Vol.1 (CBB1C) — a Chinese exclusive release. This artwork was commissioned and released only in the Chinese print run.
Condition & grading
You will receive a PSA 10 (Gem Mint) graded copy. PSA 10 is the highest grade PSA awards: a virtually flawless card, centred within PSA’s strict tolerance, with sharp corners, clean edges and a clean surface.
Important: because this is a sourcing pre-order, we do not hold a specific slab when you order. The certification number is issued to us only once we have sourced your card, and it will be confirmed to you before dispatch. We never publish a certification number we do not yet hold.
Read our Grading Guide for how PSA grades work, and why we only sell PSA 10.
Why the artwork matters
Every Gem Pack volume has included original artwork commissioned for the Chinese release only, in limited print runs with no confirmed reprints.
Dispatch & cancellation
- We dispatch within 15 business days of your order — in practice most orders ship in 5–10 business days. The 15-business-day window is our maximum commitment, not our usual timeline.
- You may cancel for a full refund at any time before dispatch.
- If we cannot source the card, we refund you in full automatically — no request needed.
- We send progress updates on business day 1, business day 5 and business day 10.
- If we have not dispatched by business day 15, we will contact you before that date to either refund you in full or ask for your explicit consent to wait longer.
- Full terms: Pre-Order & Sourcing Terms. Please also read our Refund Policy and Shipping Policy.
Shipping
Ships from Hong Kong, China. Free US shipping on orders over $50. Every slab is packed in a protective case with bubble wrap and rigid board backing.
Frequently asked questions
- Is this the Simplified Chinese version?
- Yes — this is the Simplified Chinese print of Gem Pack Vol.1 AR Fuecoco & Roy. Simplified Chinese print runs are far smaller than the Japanese and English runs, which makes graded copies scarcer.
- Is the photo the exact card I will receive?
- No. The image is for illustration; you receive a PSA 10 example of this card, and the certification number is confirmed to you before dispatch.
- Can I cancel before it ships?
- Yes — you can cancel for a full refund at any time before dispatch, and if we cannot source the card we refund you in full automatically.
Looking for a different card?
Can’t find the card you want? Find this Card for Me — tell us the card, set and card number, and we will come back with a price and a lead time before you pay anything.
Image is for illustration. The graded card you receive is a PSA 10 example of this card — not the exact slab pictured.







